Greenrock Logistics Hall Neuötting | Germany In the context of this project, a logistics hall with a total floor space of 10,200 m² was built using timber construction. For this, we supplied 840 m³ of binderholz glulam. A total of 47 trusses with a span of 22 m were installed. The timber structure was built in seven calendar weeks. Thanks to the use of timer beams, the plot could be utilised more efficiently, as they can be used in a more flexible way. Thus, the superstructure was made entirely of timber while the hall's usable area could be extended by 400 m². Photos: © Ligna systems