CLT BBS processing manual

3 Binderholz Bausysteme GmbH Purpose 4 Target group 4 Work preparation project planning 5 Process of AV project planning 6 Presentation of plan 7 Plan issuance 8 Template planning record 9 Edge processing CLT BBS 10 Drillholes 10 Cutouts 11 Break-throughs 12 Pocket milling 13 Cutout angle < 90° 13 Machining tolerances 14 Cutout variants 15 Offset of cutouts 16 Example | checklist for CLT BBS deliveries 17 Loading plans 18 Loading types | truck 19 Loading types | rail 21 Loading types | containers 22 Manipulation | loading 23 Loading guidelines 23 Consignment note - CMR 24 Example of delivery note 25 Manipulation | unloading 26 Unloading 26 Lifting anchor 26 Lifting loop 27 Lifting loops + bolt/thorn 27 Lifting loops for non-visible quality 28 Lifting loops with a thorn 28 Lifting loops double hole 29 Assy/T-lift screws 29 Packages with premounted lifting loops 29 Other lifting options 30 Consequences of usage of wrong lifting systems by the customer 30 Manipulation | storage 31 Intermediate storage at the construction site 31 Assembly | walls on ground floor 32 Checking of the floor plate 32 Bituminous sealing against humidity 32 Setting up the walls 33 Setting of angles 33 Compensation plates for levelling 34 Foot threshold 34 Erection of first wall 35 Erection of second wall 36 Outer wall - inner wall 37 Erection of remaining walls 37 Assembly | ceilings 38 Application of sealing membrane 38 Mounting of the ceiling 38 Second ceiling element 39 Remaining ceiling elements 39 Execution detail: Longitudinal joint of element 40 Execution detail: Longitudinal joint of element in the wall axes I jetty (e.g. balcony) 40 Assembly | walls upper floor 41 Setting up the walls in the first upper floor 41 Setting of angles 41 Assembly | protection 42 Weather protection 42 Temporary construction time sealing 42 Shell construction details 43 - 117 Safety at the construction site 118 Personal protection equipment 118 Fall protection 118 TABLE OF CONTENTS

RkJQdWJsaXNoZXIy NTQ5ODU5