CLT BBS processing manual

20 Binderholz Bausysteme GmbH Packages • Various format sizes such as CLT BBS 125 & CLT BBS XL elements are wrapped separately in foil • Boards of similar dimensions are wrapped in foil to form packages • Intermediate storage of these packages at the construction site is possible • The foil acts as UV and weather protection • Unloading is possible by forklift or crane • Transported in a lying position (exception: loading in containers) Tight up = the boards are stapled on top of each other without intermediate layers • Loading CLT BBS elements directly on top of each other is possible only with the CLT BBS XL format • The whole truck load is wrapped in foil once • Observe weather conditions during unloading • Unloading by means of a crane The final sequence of loading the packages is subject to loading safety rules according to the general road traffic regulations (StVO).