The Austrian forest has absorbed approx. 800 million tons of carbon (C). That is 40 times the amount of greenhouse gases produced
in the country in a year. Read more

 

 

 

schließen|close|chiudere|cerrar|fermer|близко

 

For binderholz, environmental protection and environmental compatibility mean sustainable, ecological responsibility in relation to human
beings and nature alike. That’s why products and production processes are systematically guided by and continually developed further
according to ecological criteria. Read more

 

schließen|close|chiudere|cerrar|fermer|близко

International surveys acknowledge that timber construction has a great future. While the ecological component has constituted the
decisive factor until recently, solid economic arguments play an increasingly important role now. Read more

 

 

schließen|close|chiudere|cerrar|fermer|близко

Press

schließen|close|chiudere|cerrar|fermer|близко
FAIL (the browser should render some flash content, not this).


In 1950 the timber trading company Franz Binder was founded.

 

Purchase of a small sawmill in Fügen

 

Headquarters Fuegen

In 1974 the existing single frame saw mill was demolished and replaced with a rebuilt double frame saw mill. The sawing capacity was subsequently increased to 60.000 fm per year.

 

Within a few hours on the 14th October 1984 a huge fire had destroyed the original industrial plant which had been constructed over the last 27 years. In 1984 and 1985 the production facilities were reconstructed with the most up-to-date technology and the sawing output was further increased to (a new level of) 210.000 fm per year.

 

In 1989 the solid wood board factory in St. Georgen near Salzburg started production.

 

In 1996 the glulam factory in Jenbach (Tirol) started production and the timber trade market was unveiled in Fügen.

 

In 1999 the MDF plant at Hallein started production

 

Put into operation of the biomass power plant and pellets/briquettes mill

 

In 2005 a centre for advanced wood processing at Kösching/Interpark startet production

 

In 2006 cross laminated timber factory in Unternberg/Salzburg startet production

 

New workshop building in Fuegen

Extension to headquarters in Fuegen

 

News

DasPosthotel, Zell im Zillertal | Austria 4-storey hotel in solid wood BBS  read...